Location: Hinkley Point C – New Nuclear Build – Somerset.
Project: LV Installation to HAN – HAE – HAW Buildings.
Programme: 14 Months
Contract Value: 1.8M

MMES collaborated with the modular building’s main contractors and M & E contractors to bring together a conceptual set of buildings designed to facilitate the building of the new power station at HPC.MMES worked with clients to deliver design changes complete with necessary calculations, Bill of quantities and programmes to enable on time delivery of the projects original scope and client’s modifications. Health safety and quality records always maintained throughout the works and used to ensure compliance and efficiency.

East, North and West buildings –MMES carried out complete LV installations from 2 MVA incoming supplies and switchboard, containment throughout all floors, sub main cabling and distribution boards, lighting and power wiring and all fixtures and fittings. All containment and cabling systems were installed for IT, access control, BMS, Fire alarm, emergency broadcast for specialist contractors.

Within each building the following areas were fitted out with all the above services to bring them into operational use.

Ground floor –Mains Switch rooms –Kitchens and Servery’s –Coffee Shops, Retail Shops, Restaurant, Pot wash, Vending and Self-Catering Areas. Toilets and Washrooms, Large Meeting Rooms with Full Audio-Visual Facilities. Offices and Stores, Security Reception and Lift Systems.

First Floor –Locker rooms shower, Toilet and washing facilities, PPE stores, open plan offices, meeting rooms and break out areas, IT Network server rooms, plant rooms.

Second Floor –1000 Seat open plan offices, meeting rooms and breakout areas, HVAC roof plant rooms.


Hinkley Point C